San Joaquin & Eastern Railroad | |
---|---|
Locale | Sierra Nevada foothills of Fresno County, California |
Dates of operation | 1912–1933 |
Track gauge | 4 ft 8 1⁄2 in (1,435 mm) (standard gauge) |
Headquarters | Los Angeles, California |
The San Joaquin & Eastern Railroad (SJ&E) was a standard gauge common carrier railroad that operated in the foothills of the Sierra Nevada Mountains of Fresno County in the U.S. state of California. The line was abandoned in 1933. The railroad hauled primarily lumber and agricultural products.
Contents |
The SJ&E was originally built to get men and supplies to the Big Creek Hydroelectric Project and Dam for the Pacific Light and Power Company (now Southern California Edison). The track was constructed for $1,055,728 by a railroad contractor named Stone & Webster Company and grading commenced on February 16, 1912 and construction was completed on December 15, 1912. The 55 mile line started at El Prado (near Friant where it interchanged with the Southern Pacific Railroad. The SP branch continued on to Fresno where it intercepted the SP Mainline. From El Prado the line went east to Auberry and then terminated at Big Creek (Cascade/Cascada).
The railroad was known as the “crookedest railroad in the world”. The railroad featured 1073 curves up to 60 degrees. The railroad had 43 wooden trestles and 255 steep grades with the steepest at 5.3%.
The track was abandoned and dismantled in 1933 amid the Great Depression.
The railroad owned 5 passenger cars and the railroad's October 10, 1915 timetable showed an 8:00 a.m. departure from El Prado, arriving at Cascada at 2:25 p.m. The 55 mile trip operating on Mondays, Wednesdays and Fridays and returns on Tuesdays, Thursdays, and Saturdays. Passenger service continued as late as 1929. Some of the passenger traffic was attributed to tourists going to the resort at Huntington Lake during the summer.